Professional Engineering & Environmental Services across Ontario 855-947-0011

GPM Environmental
GPM Environmental
  • Home
  • Services
  • Projects
  • Contact Us
  • More
    • Home
    • Services
    • Projects
    • Contact Us
  • Home
  • Services
  • Projects
  • Contact Us

Projects

Construction Projects

City of Toronto

  • 26TR-OM-731-NY-TR — Eglinton Avenue East Interim Repairs and Resurfacing, Mount Pleasant Road to Brentcliffe Road
  • 26ECS-RD-05LR — Road Improvements on King Henry's, Bellvare, Rosemarie and Sun
  • 25ECS-RD-13SP — Wellesley Street
  • 25ECS-RD-05RR — Road Resurfacing, Watermain and Sidewalk Improvements, Sorauren Avenue (Dundas Street to Queen Street)
  • 25ECS-RD-05SW — Watermain and TTC Track Replacement, King Street East and Church Street
  • 25ECS-RD-04SW — College Street and McCaul Street
  • 25ECS-RD-02SW — King Street and Dufferin Street
  • 25ECS-RD-02LR — Road Improvements on Gibson, Amherst, Clovelly, Hopewell and Jones
  • 25ECS-RD-01LR — Ridelle Avenue
  • 25ECS-LU-04SU — Watermain Replacement on Cecil Street and Road Resurfacing on Warden Avenue
  • 25ECS-LU-03SU — Fourth, Neilson, Dundas and Fre
  • 25ECS-LU-03FP — Basement Flooding Protection Program, Kipling Avenue and Local Roads, Phase 4, Assignment 36-18
  • 25ECS-RD-103LR — Pedestrian Infrastructure and Road Resurfacing on Multiple Streets
  • 25ECS-RD-16SP — Mercer Street Streetscape Improvements, Blue Jays Way to John Street
  • 25ECS-RD-04RR — Balmoral, Erskine, Redpath and Runnymede Improvements
  • 24ECS-RD-13SP — Bedford Road Reconstruction
  • 24ECS-RD-11SP — Sammon Avenue Road Reconstruction, Sidewalk Widening and Water Service Replacement
  • 24ECS-RD-07MR — Calvington Drive Resurfacing, State of Good Repair and Traffic Signal Improvements
  • 24ECS-RD-05MR — Dufferin Street Reconstruction and Resurfacing, Bloor Street West to Geary Avenue
  • 24ECS-RD-03LR — Road Resurfacing on Stephenson, Cosburn, Main, Westlake and Haldon Avenues
  • 24ECS-RD-02LR — Road Rehabilitation and Sanitary Sewer Replacement on Ford, Cloverdale, Silverthorn and Talbot Streets
  • 24ECS-RD-01LR — Road Resurfacing on John Garland Boulevard, Delrosa Court, Nottawasaga Court and Rampart Road
  • 24ECS-LU-03TT — Scott Street Sewage Pumping Station Connection and Incoming Sewer
  • 24ECS-LU-02SU — Watermain and Sewer Replacement, Laneway Reconstruction and Neighbourhood Improvements
  • 24ECS-BE-16PM — Farr Avenue Bridge and Driftwood Avenue Pedestrian Bridge Rehabilitation
  • 24ECS-BE-12PM — Don Valley Parkway Ramp and Pedestrian Bridge Rehabilitation
  • 24ECS-BE-07PM — Grandravine Drive Culvert Replacement over Black Creek
  • 24ECS-BE-01PM — Silverstone Drive Culvert Replacement over Albion Creek
  • 23ECS-RD-14SP — Pape Avenue, Donlands Avenue and Millwood Road Reconstruction, Resurfacing and Cycle Tracks
  • 23ECS-RD-13SP — Bloor Street Reconstruction, Avenue Road to Spadina Avenue
  • 23ECS-RD-11SP — Watermain and TTC Track Replacement
  • 23ECS-RD-102LR — Road Resurfacing, Reconstruction, Watermain Replacement and Sidewalk Construction
  • 23ECS-RD-09SP — Adelaide Street Pre-Construction Video Documentation, York Street to Church Street
  • 23ECS-RD-05LR — Watermain and Sewer Replacement, Road Resurfacing and Sidewalk Construction
  • 23ECS-RD-04SP — Watermain Installation and TTC Track Replacement, Gerrard Street East and Coxwell Avenue
  • 23ECS-RD-01LR — Local Road Resurfacing, Intersection Improvements, Sidewalk Construction and Bikeway Markings
  • 23ECS-M1-03FS — Basement Flooding Protection Program, Fairbank-Silverthorn, Phase 2
  • 23ECS-MI-02FS — Basement Flooding Protection Program, Fairbank-Silverthorn, Phase 2
  • 23ECS-LU-06FP — Basement Flooding Protection Program, Saxony-Chapman
  • 23ECS-BE-10BSE — St. Clair Avenue West Bridge Rehabilitation under Metrolinx Railway
  • 23ECS-BE-04BSE — Don Valley Parkway Bridge Rehabilitation under Metrolinx Railway
  • 22ECS-TI-16MR — North Queen Street Sidewalk Construction, Eastside Drive to The East Mall
  • 22ECS-TI-11SP — King Street West and Shaw Street Watermain and TTC Track Replacement
  • 22ECS-TI-103LR — Road Reconstruction, Resurfacing, Watermain Replacement and Sidewalk Construction in Multiple Neighbourhoods
  • 22ECS-TI-05LR — Hogg's Hollow Road and Stormwater Management Improvements, Phase 7
  • 22ECS-TI-03SP — Ossington Avenue Road Resurfacing, Queen Street West to Argyle Street
  • 22ECS-TI-03LR — Road Reconstruction, Resurfacing and Sidewalk Replacement on Multiple Streets
  • 22ECS-TI-04LR — Watermain and Sewer Replacement, Resurfacing and Green Infrastructure Improvements
  • 22ECS-LU-02TT — Yonge Street Watermain, Sanitary Sewer and Water Service Replacement, Queens Quay to Wellington Street
  • 22ECS-BE-17BSE — Bridge ID124 Rehabilitation, Phase 2
  • 22ECS-BE-12BSE — South Kingsway Bridge Rehabilitation over The Queensway and Metrolinx Railway
  • 22ESC-BE-09BSE — Pedestrian Bridge Replacements at Stubbswood Square, Silversted Drive and Brimley Woods Park
  • 22ECS-BE-06BSE — Canlish Road Culvert Replacement over Dorset Park Interceptor
  • 21ECS-TI-21MR — Kipling Avenue Watermain Crossing over Humber River Bridge and Structural Modifications
  • 21ECS-TI-102LR — Bathurst Street Watermain Replacement and Major and Local Road Resurfacing
  • 21ECS-TI-06BE — Innes Avenue Pedestrian Bridge Rehabilitation over Railway
  • 21ECS-TI-05SP — Queen Street TTC Track Reconstruction and Watermain Works
  • 21ECS-TI-02LR — Canongate Trail Road Resurfacing and Reconstruction
  • 21ECS-LU-10FP — Basement Flooding Protection Program, Phase 4
  • 21ECS-LU-05FP — Basement Flooding Protection Program, Phase 4, Multiple Assignments
  • 21ECS-LU-04SM — Road Resurfacing and Green Infrastructure on Bradfield, Cannon, Ludlow and Meadowvale
  • 21TR-PMD-03-CPP — Downsview Cycling Connections
  • 20ECS-TI-20SP — TTC Track Reconstruction and Landscaping, Wellington Street and Various Locations
  • 20ECS-TI-19SP — Roncesvalles Avenue, Queen Street West and King Street West Reconstruction
  • 20ECS-TI-16MR — Kipling Avenue Major Road Reconstruction, South of Mount Olive Drive
  • 20ECS-TI-15SP — Bathurst Street TTC Track Reconstruction, Wolseley Loop to Dundas Street West
  • 20ECS-TI-10SP — Church Street Road Resurfacing and TTC Track Removal
  • 20ECS-TI-10MR — Watermain Replacement and Road Resurfacing, Donway East and West
  • 20ECS-TI-04LR — Thyra Avenue and Laneway Reconstruction with Pedestrian and Cycling Infrastructure
  • 20ECS-TI-103LR — Dovercourt Road Watermain Replacement and Hanna Avenue Sidewalk Construction
  • 19ECS-LU-14FP — Basement Flooding Protection Program, Storm Sewer Works on Prue Avenue
  • 19ECS-LU-05FP — Basement Flooding Protection Program, Phase 4, Multiple Assignments
  • 188-2019 — Watermain and Substandard Water Service Replacement
  • 15-2019 — Forcemain Replacements at Port Union, Sewells, Roxborough and Copeland
  • Culvert Replacement Projects — Danforth Road, Sheppard Avenue, Foxridge Drive and Reesor Road
  • T57SP22325 — TTC King Street and Sumach Street Track Replacement
  • 2358 Midland Avenue, Scarborough — Pre-Construction Video Documentation
  • 6505 Kingston Road, Scarborough — Pre-Construction Condition Survey
  • 710 Markham Road — Construction Vibration Monitoring
  • Metro Toronto Convention Centre — Expansion Infrastructure Contract

City of Barrie

  • FIN2026-016T — 2026 Pavement Management Program 2
  • FIN2026-015T — 2026 Pavement Management Program 1
  • 2026-003 — Peel Street Reconstruction
  • FIN2026-058T — Grove Neighbourhood Resurfacing, Berczy, Davidson and Newton Streets
  • FIN2025-202T — Cundles Neighbourhood Resurfacing, Sections B, C and D
  • FIN2025-046T — 2025 Pavement Management Program
  • 2025-172T — Mapleview Drive East Road Improvements, Yonge Street to Prince William Way
  • FIN2024-108T — Queens A Neighbourhood Renewal Program
  • FIN2024-084T — Bayview Drive Transmission Watermain and Road Expansion
  • FIN2024-082T — Essa Road, Brock Park and Grove Park Neighbourhood Resurfacing
  • FIN2024-042T — Ferndale Water Tower Repairs and Upgrades
  • FIN2023-109T — 2023 Road Resurfacing Program
  • FIN2022-165T — Grove Street East Watermain Replacement, Nelson Street to Johnson Street
  • FIN2022-112T — 2022 Road Resurfacing Program, Fairview Road and Grove Street
  • FIN2022-006T — Tiffin Street Transmission Watermain and Road Resurfacing
  • FIN2022-003T — 2022 Road Resurfacing Program
  • 366 Penetanguishene Road — Royal Victoria Hospital Johnson Flats Offsite Parking Lot
  • 545 Dunlop Street West — External Works
  • Mary Street — Basement Leakage and Sump Pump Inspections

Regional Municipality of York

  • Town of East Gwillimbury, T-25-32 — Mount Albert Downtown Revitalization
  • RFTC-1740-24 — Newmarket Glenway Facility Upgrades, 335 Kirby Crescent
  • Q-23-06 — Highway 404 Mid-Block Crossing North of 16th Avenue
  • RFTC-937-22-T-20-08 — Duffin Water Pollution Control Plant Biosolids Treatment Replacement, Contract 1
  • RFTC-797-22 — Water and Wastewater Facility Fuel Oil Appliance Upgrades
  • 22-130 — Carrville Road Retaining Wall Rehabilitation, East of Bathurst Street
  • 22-100 — Major Mackenzie Drive Improvements, Jane Street to Keele Street
  • RFQ-Q-22-10 — Dufferin Street and Rutherford Road Infrastructure Improvements
  • Q-21-08 — Rutherford Road Pre- and Post-Construction Surveys
  • QE-20-02 — Henderson Drive, Aurora
  • 26 Bayview Parkway, Newmarket — Demolition Project
  • Major Davis Drive and Bathurst Street — Construction Condition Surveys
  • Major Mackenzie Drive — Road Widening
  • Bayview Avenue — Construction Surveys, Elgin Mills Road to Stouffville Road
  • City of Richmond Hill, RFQ-2510070 — Arnold Crescent, Highland Lane and Elizabeth Street Road Reconstruction

Regional Municipality of Halton

  • Halton Region, W-4449A-26 — Watermain Upsizing, Burlington and Oakville
  • S-3446A-25 — Saville Crescent Area Wastewater Main Replacement, Oakville
  • Town of Halton Hills, S-2987C-25 — John Street Pumping Station Upgrades and Rehabilitation, Georgetown
  • S-3245A-23 — Bromley Park and Paletta Gardens Wastewater Pumping Station Upgrades, Burlington
  • S-3281A-23 — Skyway Wastewater Treatment Plant Digester No. 2 Upgrades, Burlington
  • W-3343A-23 — Mount Forest Reservoir and Pumping Station Decommissioning, Burlington
  • R-2261C-Part 3-22 — Tremaine Road and Highway 401 Interchange Construction and Bridge Demolition, Milton
  • S-3327A-22 — Halton Biosolids Management Centre Dewatering Upgrades
  • WS-3156A-22 — Bridgeview Sewage Pumping Station, Forcemain and Watermain Works, Burlington
  • WS-3010A-22 — Bomorda Drive and Churchill Avenue Watermain Replacement, Oakville
  • WS-3212A-20 — Prince Charles Drive Water and Wastewater Replacement, Halton Hills
  • W-2991A-1-19 — Pressure Reducing Valve Chambers, Zone 4M, Oakville
  • Harvestview Sewage Pumping Station, Bolton — Ground Vibration Monitoring
  • Davis Road Pumping Station — Infrastructure Improvements
  • Town of Milton — Polybutylene Water Service Replacement

Town of Newmarket

  • RFP-2025-015 — Hillview Drive Reconstruction and Penn Avenue Sidewalk
  • Millard-Church-Elm — 2024 Road Reconstruction
  • RFP-2022-002 — McCaffrey Road Reconstruction and Road Resurfacing
  • RFP-2020-019 — Mulock Park Development
  • Queen Street Bridge — Reconstruction, Vibration Monitoring and Property Inspections
  • Lorne Avenue — Reconstruction, Phases 1 and 2
  • Cody Crescent — Watermain Replacement
  • College Manor Drive — Stormwater Pond Slope Stability Improvements
  • 35 Patterson Street — Hollingsworth Civic Arena Demolition

Regional Municipality of Peel

  • 2026-112T — Maple Grove Road Watermain Replacement, Caledon
  • 2024-206T — Watermain Replacement and Sanitary Sewer Replacement, Mississauga
  • 2023-380T — North Brampton Pumping Station Electrical Upgrades
  • 22-1340 C — Victoria Terrace Watermain and Road Reconstruction
  • 2021-253T — Bridgestone Lane and Catcay Court Watermain and Forcemain Works, Mississauga
  • RFT-2021-053T — Glen Erin Drive Watermain Replacement, Phase 1
  • 2021-029T — Sanitary Sewer Replacement on Various Streets, Mississauga
  • 2020-063T — Holmes Drive, Arlow Road and Palace Street Watermain Replacement, Caledon
  • 2019-021T — Mayfield Road and McVean Drive Watermain Works, Brampton

Eastern & Northern Ontario

  • Town of Cobourg, 01-ENG-2025 — Cobourg East Community Trunk Servicing, Part A
  • Peterborough County, T-11-2024 — County Road 48 Reconstruction
  • City of Oshawa, C-2024-106 — Bond Simcoe Urban Square Construction
  • City of Kawartha Lakes, 2024-016-CQ — King Street Reconstruction
  • Municipality of Clarington, CL2023-5 — Brown Street Reconstruction
  • Municipality of Port Hope, 42-ENG-2023-B — Lake Street Trunk Sewer Replacement
  • Toronto and Region Conservation Authority (TRCA), 10042320 — Scarborough Waterfront Project, West Segment, Brimley Road Multi-Use Trail
  • City of Quinte West, 25-10 — McCann Street and Sidney Street Road Rehabilitation
  • Chippewas of Georgina Island First Nation, F20046/F21017 — Water Distribution System Upgrades and 63 Franklin Beach Drive

City of Kitchener

  • MTE-T-26-08 — Stauffer Woods Subdivision, Stage 6, Pine Warbler
  • MTE-T-24-54 — New Dundee Road Property Inspections
  • Q25-089 — Laneway Resurfacing, Laneways 50038, 50039, 50005, 50006 and 50148
  • Q24-013 — Wilson Avenue Reconstruction, North End to Fairlawn Road
  • Q24-007 — Becker Street, Fife Avenue and Ann Street Reconstruction
  • T21-092 — Fergus Avenue and Clover Place Reconstruction
  • T21-003 — Becker Street Reconstruction
  • T19-202 — Ephraim Street and Ethel Street Reconstruction

City of Hamilton

  • C13-10-25 — Low Lift Pumping Station Intake Pipeline Rehabilitation
  • C13-18-22 — Chedoke Creek Targeted Dredging
  • C15-16-24 HSW — Wilson Street, Wentworth Street North and Sherman Avenue North Rehabilitation
  • 846 Garner Road East — Construction Vibration Monitoring and Property Inspections
  • Templemead Drive — Development Project
  • Waterdown Innovation Drive — Development Project
  • Ancaster Meadowlands — Infrastructure Development

Other Eastern & Northern Ontario Locations

  • Belleville — Water Treatment Plant
  • Port Severn — Water Treatment Plant
  • Moosonee — Water Treatment Plant and Sewage Treatment Facilities
  • Rockland — Water Treatment Plant and Sewage Systems
  • Plantagenet — Water Treatment Plant
  • Limoges — Sewage Systems
  • Elizabethtown — Water Supply
  • Vankleek Hill — Water Supply

City of Markham

  • 141-T-24 — 2024 Sidewalk Construction Program
  • 130-T-23 — Erosion Restoration at Site ROU 211
  • 299-T-22 — West Thornhill Phase 4B Storm Sewer Replacement
  • 242-T-21 — West Thornhill Phase 3C Storm Sewer and Watermain Replacement
  • McNicholl Metro Watermain — Watermain Infrastructure Project

Toronto Transit Commission (TTC)

  • P65-5 — Long Branch Loop Track Replacement
  • A65-49 — Spadina Loop Track Replacement
  • B65-3 — Dundas West Station Loop Track Replacement
  • D65-2 — Broadview Station Loop Track Replacement
  • Fleet Street — TTC Track Works, Fort York to Garrison Boulevard

City of Guelph

  • 25-130 — Speedvale Avenue East Reconstruction, Phase 2
  • 22-151 — Baker Street Underground Infrastructure Reconstruction
  • 22-029 — Arkell Aqueduct Middle Reach Maintenance Access, Phase 2
  • 22-026 — Eramosa Road Watermain Replacement
  • 621187 — Ontario Veterinary College Laneway Reconstruction, University of Guelph

Durham Region & Area Municipalities

  • Region of Durham, D2026-54 — Kingston Road Bus Rapid Transit Project, Pickering
  • Durham Region, D2023-60 — Pickering Beach Road and Achilles Road Watermain Construction, Ajax
  • Durham Region, D2023-50 — Lake Simcoe Water Pollution Control Plant Aeration System Upgrades, Brock
  • Durham Region, D2020-45 — Road and Watermain Construction on Range Road, Lake Ridge Road and Ontoro Boulevard, Ajax
  • Town of Ajax, T25003 — Puckrin Bridge Widening
  • Town of Ajax, T23013 — Range Line Road Reconstruction
  • Town of Ajax, T21028 — Rossland Road Reconstruction, Phase 3

City of Brampton

  • T2022-208 — Cottrelle Boulevard Extension, Humberwest Parkway to Goreway Drive
  • T2022-179 — Goreway Drive Reconstruction and Four-Lane Widening, Cottrelle Boulevard to Countryside Drive
  • T2021-010 — Chinguacousy Road Reconstruction and Widening, Wanless Drive to Mayfield Road
  • RFP2019-071 — Gore Meadows Recreation Centre Permanent Cricket Facility, Design and Construction

City of Mississauga

  • 25tR013A — Asphalt Replacement at 2365 Matheson Boulevard East
  • 22-1310 H2 — Moonee Road Sanitary Sewer Installation
  • PRC004175 — McKenzie Stormwater Management Facility
  • PRC003525 — Burnhamthorpe Road West Bridge Rehabilitation over Sawmill Creek Trail

Waterloo Region

  • T2024-102 — Hespeler Wastewater Treatment Plant Disinfection Upgrades
  • Township of Woolwich, 2024-01 — George Street, High Street and Charles Street Reconstruction
  • T2023-169 — Waterloo Wastewater Treatment Plant Aeration and UV Bypass Upgrades
  • T2022-105 — Avenue Road 450 mm Watermain Installation, Cambridge
  • T2022-117 — Line 86 Improvements, Wallenstein, Wellesley, Mapleton and Wellington
  • City of Cambridge, T2018-93 — Wright Avenue and Goldie Avenue Reconstruction

Private & Industrial Clients

  • Green Metals Canada Inc., Woodstock — Concrete Bunker Annual Reports, Oily Water Collection System Leakage Testing, Acoustic Audits, Storm Drain Investigation and Environmental Compliance Documentation
  • GIP Remediation, Former Ontario Science Centre, Toronto — Remediation Project, 770 Don Mills Road
  • Clark Kennedy Co. Inc., Toronto — Annual Environmental Reports and Environmental Compliance Approval Requirements, 15 Leading Road
  • Martin-Brower of Canada Co. — Emission Sampling and Environmental Compliance Approval
  • Legend Oilfield — Environmental Compliance Approval Application
  • Reef Kitchens — Environmental Compliance Approval for Non-Hazardous Waste Transportation Systems
  • Makkinga Contractors — Environmental Activity and Sector Registry and Acoustic Assessment Reports
  • Private Industrial Facility — Ministry of the Environment Approvals for Spray-Painting Operations
  • Green Metals Canada Inc. — Environmental Ministry Coordination and Letter of Credit

Town of Aurora

  • 24-PROC-0007 — Poplar Crescent Full Road Reconstruction
  • 2022-38-PDS-ENG — Yonge Street and Wellington Street Intersection Improvements
  • 2020-21-PDS-ENG — Holman Crescent, Johnson Road, Baldwin Road and Browning Court Road Reconstruction

Town of Caledon

  • 2025-086 — Mill Street Bridge Erosion and Scour Protection
  • 2024-028 — Rehabilitation of Two Pedestrian Trail Structures
  • 2020-27 — Old School Road Reconstruction

City of Waterloo

  • RFT23-21 — Park Street and John Street Multi-Use Path Connection
  • RFT23-02 — Teakwood Drive, Teakwood Place and Thorncrest Drive Reconstruction
  • RFT22-10 — Phillip Street and Hazel Street Multi-Use Path and Cycling Infrastructure

City of Burlington

  • ES-23-01 — Waterdown Road Widening and Reconstruction
  • Washburn Water Booster Pumping Station — Infrastructure Project

City of Vaughan

  • RFTC-171-21-20-101 — Rutherford Road Reconstruction and Widening, Canada's Wonderland Drive to Westburne Drive
  • T22-002 — Woodbridge Avenue Improvements, Kipling Avenue to Islington Avenue

City of Orillia

  • 2026-007-DSE-ENG — Jarvis Street Phase 2 Construction, Interior and Exterior Property Inspections
  • 2024-054-ENG-DSE — Harvie Hill Standpipe Construction

Township of Clearview

  • 2024-03 — Collingwood Street Bridge Replacement, Bridge 161b-71, Road Reconstruction and Domestic Well Surveys

Township of Essa

  • 224006 — Simcoe Street and Raglan Street Reconstruction, Including 50 and 55 Simcoe Street

Simcoe County & Area

  • Town of Midland, ENG 2025-014 — Yonge Street Reconstruction
  • Simcoe County, 2024R21-758-01 — County Road 21 Reconstruction, Phase 2, Innisfil Beach Road
  • Town of Innisfil, C-23-102 — Cookstown Road Improvements and Watermain Replacement

Township of Centre Wellington

  • RFT-12-24 — St. David Street North Reconstruction, Highway 6, Fergus
  • RFT-13-22 — St. George Street East Reconstruction, Fergus
  • Clayton Subdivision Site Preparation and Earthworks, Elora | Project 2903

Dufferin County

  • County Road 124 and County Road 21 Resurfacing

Town of Erin

  • Daniel Street and Scotch Street Trunk Storm Sewer Construction

Niagara Region & Southwestern Ontario

  • City of Brantford, 2024-58 — Water Treatment Plant Chlorination and UV Disinfection Upgrades
  • Niagara Remediation Project — Environmental Remediation, Niagara Peninsula Conservation Authority
  • Niagara Protective Coatings — Land Use Assessment and Surveys

Environmental Approvals

  1. Toyota Tsusho Canada ECA 0743-95SQ57 Annual Compliance and Monitoring Reports 2014 - 2030 
  2. Toyota Tsusho Canada ECA 4415-BRQJ92 Annual Compliance and Monitoring Reports 2014 - 2030
  3. Toyota Tsusho Canada ECA 0743-95SQ57 Leak test for hydraulic performance of the liquid collection system on the steel building floor 
  4. Toyota Tsusho Canada Green Metals Steel Recycling Building ECA 0743-95SQ57 issued on April 28, 2014 Annual Reports 2014 -  ongoing 
  5. Toyota Tsusho Canada ECA 4415-BRQJ92 issued on September 14, 2020 
  6. Toyota Tsusho Canada ECA 4415-BRQJ92 Sep. 2020 Green Metals Canada Inc. 
  7. Toyota Tsusho Canada Inc. ECA 2788-AHQP8Q May 16, 2017 224 Beard's Lane, Woodstock, ON, N4S 7W3 
  8. Toyota Tsusho Canada mitigation measures for facility hydraulic oil spills 
  9. Toyota Tsusho Canada environmental investigation of stormwater drainage plan of facility storm sewers 
  10. Toyota Tsusho Canada ECA 2788-AHQP8Q  Issue Date: May 16, 2017, Inc. 224 Beard's Lane Woodstock, ON N4S 7W3 
  11. Makkinga Contractors ECA for  Crusher and screening equipment rental below grade operations, 570 Squier Place, Thunder Bay, Ontario, P7B 6M2 
  12. Toyota Tsusho Canada ECA 2788-AHQP8Q  Issue Date: May 16, 2017, Inc. 224 Beard's Lane Woodstock, ON N4S 7W3
  13. Niagara Protective Coatings, Annual Reports for ECA for 7071 Oakwood Drive Niagara Falls, Ontario, L2G 0J3 
  14. Reef Kitchens EASR for 900 Don Mills Road, Toronto,, Ontario, M3C 1V6 
  15. Frontline Machinery Limited EASR for 43779 Progress Way Chilliwack, BC, Canada V2R 0E6 
  16. West Harbour City II Condos ECA for 21 Grand Magazine St. Toronto ON M5V 1B5  
  17. Velvet Sunrise Coffee ECA Sep. 2020 
  18. Massive Auto Collision ECA 1000102497 Oct 2020 
  19. OSTACO EASR (2000) Windows, 
  20. Stanpac ECA Jun 2020 
  21. EASR R-010-4111669677 Oct 24, 2019 
  22. California Condos ECA Jul 2019 165 Legion Rd. North Toronto, ON M8Y 0B3 
  23. Confederation Freezers ECA Jul 2019 21 York Road, Brantford, ON N3T 5L7 
  24. Confederation Freezers ECA for Jul 2019 250 Summerlea Rd. Brampton ON, L6T 3V6 
  25. Park Home Furniture Inc. ECA for Jun 2019 240 Lottridge St, Hamilton, ON, Canada, L8L 6V9 
  26. Silverstar Roofing Supplies ECA 8088-B59H7R Apr 18, 2019, 2626371 ONTARIO INC. operating as  160 Silver Star Blvd Toronto, ON M1V 5P2 
  27. Premium Body Shop Inc. EASR R-001-9111771276 Dec 02, 2019  10 Meridian Rd Etobicoke, ON M9W 4Z8 
  28. Mobile Rim Repair ECA for Grimsby, ON L3M 5A5 
  29. 2507488 ONTARIO INC. EASR R-001-9111434577 Jul 06, 2019 12 Heritage Road Unit 6 Markham, ON L3P 1M4 
  30. Logan Kitchen Inc. EASR R-010-3111235705 Apr 23, 2019, 346 Millway Avenue Concord, ON L4K 3W1 
  31. Enviroplast Inc. ECA for Oct 2019 Facility 145 Gibraltar Road, Vaughan, ON L4H 4P9 
  32. Aleafia Farms Inc. EASR R-010-7111482978 Aug 3, 2019  378 South Service Road Grimsby ON L3M 5A5 
  33. Andy's Country Repairs ECA 1000052563 Apr 2019 327 Bruce Road 2, RR4, Walkerton, ON, N0G 2V0 
  34. JF(CANADA) INC. EASR R-010-8111032528 Feb 22, 2019  2 & 3-1720 Midland Ave Scarborough, ON M1P 3C8 
  35. 2595827 ONTARIO LTD. EASR R-004-2110497131 Jun 11, 2018,  653 Pine Creek Road South Callander ON P0H 1H0 
  36. CLV Group Inc. EASR R-010-5110448561 May 15, 2018 Interrent no.1 Limited Partnership 200-485 Bank Street Ottawa ON K2P 1Z2 
  37. Ruskcast Inc. ECA 6078-AVJSCL Mar 15, 2018, 110 Ormond Street South Thorold, ON L2V 4J6 
  38. Crystal Claire Cosmetics Inc. Nov 2018 165 Milner Ave, Scarborough, ON M1S 4G7 
  39. McCarthy Septage Mar 2018 653 Pine Creek Road South Callander ON P0H 1H0 
  40. ECA 7635-AFANG4 Nov 2, 2016, Clark, Kennedy Company, Limited, 15 Leading Road Toronto, ON M9V 4B7 
  41. Toyota Tsusho Canada ECA 0743-95SQ57 Apr 28, 2014, 224 Beard's Lane, Woodstock, ON, N4S 7W3 Geovin Furniture Inc. 2014 51 Hanlan Rd #3, Woodbridge, ON L4L 3P5 
  42. The Corporation of the City of Barrie, ECA 8886-9Q3LSF Nov 12, 2014 Barrie Wastewater Treatment Facility 249 Bradford St Reference Plan 51R-11568 Barrie, ON L4N 3B6 ECA


Project Management & Environmental Approvals

Powered by

  • Home